Negotiated connections these are for connections where we need to alter extend or upgrade our network in order to enable a connection or to accommodate.
United energy solar connection form.
United energy inverter based embedded generator connection application form page 5 of 6 ue gu 0004 v6 11 02 2016 this application form is applicable for inverter generating storage systems up to 10kw phase premises.
For a new connection which is not required to be left energised turned on complete this application form and return to united energy.
Send completed form by email or mail to retailer.
Ue meter wiring diagrams for new and photovoltaic solar connections.
United energy micro embedded generator connection inverter based form page 5 of 6 inverter serial numbers the installer must fill this page if more than one inverter of the same make and model is installed at a premises.
Photovoltaic solar generator connection form distribution network please tick applicable distributor sp ausnet united energy distribution jemena electricity networks vic ltd citipower pty powercor australia ltd system size limit up to 4 5kw per site up to 10kw per phase up to 10kw.
Ue basic connection policy retail customers.
New connections form subdivisions.
United energy 30kw connection application guide when applying to united energy to connect your embedded generation system there are two applications 5 and 5a.
When the solar generator is not producing electricity in the evening the battery provides the stored excess electricity back to you and our network.
Micro embedded generation form final ue memo 2020 002.
Version 7 october 2014.
United energy will energise the new connection after receiving a request for energisation from an electricity retailer of your choice.
New alteration private overhead embedded network solar panel kw inverter kw.
1300 360 795 citipower pty 1300 132 894 jemena 1300 131 871 powercor australia ltd 1300 360 410 united energy 1300 131 689.
Only the shorter application 5a is needed when the system is below 5mw otherwise application 5 must be filled out.
The solar connection form is a prerequisite for the activation of bidirectional import export metering and for receiving a feed in tariff but distributors will be unable to initiate this work unless they have also received a copy of the electrical work request ewr and the certificate of electrical safety ces.
Basic connections typically for small to mid size connections that generally only involve the meter and don t need any upgrades or alterations to our network.
To help with your connection process we have categorised our services.