For the purposes of these instructions sealant is to be defined as the following.
Unitized curtain wall system installation pdf.
To install fire insulation according to approved shop drawing at top part of concrete beam surface prior to curtain wall installation.
The size of the unitized curtain walls are dependent on the floor to floor height of the building.
March 18 2016 installation notes 1.
Since unitized curtain walls are the current state of the art in curtain wall technology designers consultants and contractors alike need to become familiar with these systems technical limitations so that we can develop effective designs that address their use for all areas of the building enclosure.
Do not drop roll or drag boxes of aluminum framing.
8250xd unitized curtain wall system 11 21 2019 page 4 section 1.
Ycu 750 tu unitized curtain wall system page 10 04 4013 00 effective date.
Plan details vision spandrel.
Shipping facility ensures timely delivery of products.
April 22 2010 unit installation step 4 install l anchor note.
All aluminum anchors and aluminum components of the curtainwall system must be separated from the structural steel and concrete with a nylon separator or material of similar compatibility.
Ycu 750 tu unitized curtain wall system page ii 04 4013 01 effective date.
System information curtain wall 65 element façade is a cost efficient curtain wall system for element façades with.
Long pieces of aluminum hence the name stick are inserted between floors vertically and horizontally between vertical members to support and transfer the load of the glass back to structure.
General notes and guidelines f.
If fork lifts are used be especially careful about striking the boxes when lifting or moving.
Plan details slab anchor.
If your project doesn t suit most of the criteria for a unitized system your other option is to use a stick built system.
Sealant all sealant must meet astm c 920 class 50.
Here the reynaers aluminium cw 65 ef unitized façade system is employed to great effect.
Move and stack boxes with proper support to prevent distortion.
Individual installation of each component are not necessary as in sticky curtain wall system.
Safely and swiftly you can expect our highly methodized system to follow through on its shipping promise.
Curtain wall units are then hoisted up from the loading platform by means of this monorail and electric chain block and place in position at floor edge for fixing to the pre installed anchor brackets.
Possible installation solution standard element installation detail of standard bracket functionalities.