Examine the ceiling to find the lowest pipe duct or conduit.
Usg drop ceiling installation.
How to install a usg suspended ceiling 1.
Trim main tees so that a cross tee slot lines up with the cross tee string.
Medium textured with a non directional pattern these sag resistant panels are an optimal choice for use in schools corridors lobbies offices and retail stores.
Attach a hanger wire to each screw and cut 6 below the string line.
Choosing the best ceiling for your project can make all the difference.
Ceiling designs can be submitted and all of the parts and pieces for the installation will be manufactured and shipped out as a kit for faster and easier installation.
Although the components cannot be bent at the jobsite usg offers complete factory curved components for curved ceilings domes and vaults.
Usg donn brand dxf dxlf fineline 9 16in.
Don t assume the wall is straight.
Usg donn brand dx dxl concealed 15 16in.
Usg donn brand dxt dxlt centricitee 9 16in.
Measure three quarters of an inch up toward the ceiling from the mark you made in step 1.
Bend each hanger wire to a 90 degree angle 3 4 above the string line.
Install lag screws at 4 intervals along the main tee string lines.
Where two cross tees occupy the same slot insert the second cross tee to the left of the first cross tee.
Usg donn brand dx dxl standard 15 16in.
Snap a chalk line at this.
Pull each hanger wire through a round hole below the bulb of the main tee and bend up twisting the end 3 1 2 turns within a 2 in.
With an unparalleled variety of choices no matter what your ceiling needs we have you covered.
Radar acoustical ceiling panels contain a proprietary broad spectrum standard formulation that inhibits the growth of mold and mildew.
Pull each hanger wire.
The cross tee slots must line up.
Measure down 4 inches from the bottom of this object.
Place usg wall.
Installing 2 x 4 drop ceiling panels determine the size of the border panels to get the length of your border panels divide the width of the room by the length of a single panel add the remainder to the length of a single panel and divide by 2.
Usg donn brand dxw wide faced 1 1 2in.
Cut the main tees for the drop ceiling hangers.
Once you ve figured out the size of the border row measure back from the cross tee slots and cut your main tees to size.