Vapor barriers are used because while fresh concrete is poured wet it s not supposed to stay that way.
Vapor barrier over concrete slab carpet.
How to install vapor barrier on concrete floor under laminate flooring always read the flooring manufacturers recommendations and instructions before installing the underlayment.
If your concrete passes the moisture test then plastic sheeting at least 6 mils thick will prevent moisture from getting into your laminate flooring.
It seems your products are used mostly between the ground and the concrete slab.
Dimpled polyethylene underlayment is available from home centers flooring suppliers or online.
Vapor barriers have been associated with certain concrete slab on grade problems including curling and cracking.
Before rolling out the underlayment be sure to sweep vacuum and remove all debris on the substructure.
Where plastic sheets must be joined overlap the sheets by several inches and use strong vinyl tape to secure them.
Start with a vapor retarder with a perm rating that reflects the needs of the space.
A concrete vapor barrier is any material that prevents moisture from entering a concrete slab.
Many moisture problems associated with interior concrete floors and slabs on grade can be minimized or eliminated by installing a vapor barrier under the concrete.
Install it over a layer of fill.
Install a plastic vapor barrier.
I would recommend raven industries vaporblock 20 plus or the vaporblock plus 6 as two of the better ones since they also block out radon methane and voc s.
Inspect it before pouring the concrete and fix any tears it may have.
They look similar to carpet padding but they have a plastic film on the surface to block moisture.
But they have also proven to be beneficial in reducing failures of moisture sensitive flooring materials adhesives and coatings caused by excessive emission of moisture vapor from concrete slabs.
Lay the sheet over the concrete floor dimples down overlap adjacent edges and tape the seams.
It needs to dry and then stay dryto avoid flooring problems.
Add the plywood layer on top and anchor it to the concrete with 15 concrete screws predrilled and countersunk per 4 x 8 ft.
A concrete vapor barrier is simply a sheet of polyethylene plastic visqueen placed directly on top of the sub grade before the concrete floor or slab is poured to help keep moisture from the soil from passing up through the concrete.
The layers above and below the concrete slab to prevent water seepage into the slab.
Concrete absorbs and retains water and the moisture can seep into the carpet padding and then into the carpet.